Paver Base Calculator for Indiana Patios and Drive Aprons

Enter your project dimensions

ft
Enter a length greater than 0
ft
Enter a width greater than 0
ft
Enter a diameter greater than 0
in
Enter a depth between 0.25 and 24 inches

Two paved jobs in the same yard can differ by more than ten times in stone. A 3 by 20 ft garden walk needs about 1.6 tons under it. A 20 by 25 ft apron where a truck parks, on the heavy clay that covers most of this state, needs closer to 20. Same pavers, same installer, same afternoon of measuring. The difference is depth, and on ground that freezes 30 inches down and holds water above that, the depth is not a preference. This paver base calculator settles the tonnage once you have decided it.

A Garden Walk and a Truck Apron, Twelve Times Apart in Stone

The walk, 3 ft by 20 ft, is 60 sq ft of pavers. The apron, 20 ft by 25 ft, is 500 sq ft. Foot traffic on the walk takes 4 compacted inches of base. The apron takes 8, because vehicles and a soft clay subgrade each add depth. Run both and the gap is stark:

Garden walkTruck apron
Paved area60 sq ft500 sq ft
Base area, with the overhang84 sq ft536 sq ft
Compacted base depth4 in8 in
Cubic yards1.0413.2
Tons at 1.501.619.8

Eight times the paved area, twelve times the stone. That multiplier is worth knowing before anyone starts digging, because it is also the point at which a wheelbarrow job becomes a machine job.

The Six Inches Beyond the Pavers That Belong in the Length Box

The base is wider than the patio. Extend it 6 inches past every exposed paver edge, because that shelf is what the edge restraint sits on, and edge restraint pinned into lawn soil lasts about one spring.

  • The walk has four exposed sides, so its base measures 4 ft by 21 ft, not 3 by 20. That is 84 sq ft.
  • The apron butts a garage on one side, so three sides get the extension: 21 ft by 25.5 ft, or 536 sq ft.

Then the tool itself:

  1. Choose rectangle, circle or multiple areas, which takes up to five pieces and totals them. An L-shaped patio is two rectangles.
  2. Enter the base dimensions in feet, overhang included.
  3. Enter the compacted depth in inches, from 0.25 to 24.
  4. Choose the material.
  5. Leave the 10% box for compaction and spillage ticked. On a base course, always.
  6. Read cubic yards, tons and cubic feet, then email yourself the figures before you lose the scrap of paper.

Dig depth is a separate sum and worth marking on a stake before the spade goes in: base, plus 1 inch of bedding, plus the paver thickness, less whatever reveal you want above the lawn. A 4 inch base under a 2 3/8 inch paver comes to roughly 7.5 inches of excavation.

Paver Base at 1.50 Tons a Yard, Read Off a Compacted Four Inches

Dense graded stone is published here at about 3,000 lb per cubic yard, or 1.50 tons. At a compacted 4 inches, one ton covers about 54 sq ft. At 6 inches it covers 36, and at 8 inches, 27.

The jobCompacted base depth
Walkway or garden path4 in
Patio or seating area4 to 6 in
Apron or drive with vehicles on it6 to 8 in
Heavy clay or a soft subgradeadd 2 in, plus woven geotextile underneath

The clay line is the one that catches people out on a till plain. Ground that drains slowly stays soft under the base through late winter, and stone pressed into soft clay is stone that has left the base. Fabric under the layer keeps the two apart.

Lifts, Frost and the Stone You Will Actually Place

  • Compact in 2 inch lifts. A 6 inch base is three passes, not one. Mist each lift lightly, because dense graded stone packs tighter damp than dry.
  • Build the fall in at base level. A 2 to 3% slope away from the house, set in the compacted stone, carries through the sand and the pavers above it.
  • Expect to place more than you measured. Stone settles into an uneven subgrade, corners get overfilled, and the 10% allowance is a floor rather than a ceiling on soft ground. Round up to the next half ton.
  • Do not solve a wavy base with deeper sand. Sand moves. Depth belongs in the stone.

Frost is the reason all of this matters more here than it would on free-draining ground. Nothing you build goes below the frost line, so the defense is a base that drains and a subgrade that is not sitting wet under it.

#53 Stone Underneath, Screenings Only as a Skim on Top

#53 stone is the dense graded size Indiana specifies for compacted base, and it is what the full 4 or more inches should be. Limestone screenings belong in a thin leveling skim over compacted base, never as the base itself, because fine material with nothing coarse in it holds water and pumps under traffic. If you want the finer dense graded size for a topping course elsewhere on the drive, that is #73 stone and it has its own tool, the crusher run calculator.

Two other quantities sit either side of this one, and each has its own tool:

  • The 1 inch bedding layer above the base is sand, not stone, and is sized with the paver sand calculator.
  • The soil coming out of the hole is sized with the dirt calculator run in reverse, which is worth doing before you discover the spoil pile will not fit on the drive.

Take the tonnage to the product page, set your quantity and pick a date there. Delivery is arranged at checkout by ZIP code, and the truck needs clear access to a spot where the pile can be tipped, ideally on the drive rather than on the lawn you are about to rebuild. Where the subgrade is soft enough to raise doubts about the depth, ask before you dig through the contact page.

Common questions

Part of the patio ends in a half-circle fire pit surround. Which selector covers that?

Split the shape. Run the straight section as a rectangle, then treat the curve as a circle and take the fraction of it you have, usually a half or a quarter. A 10 ft round fire pit surround is about 79 sq ft whole, so a half circle is 40, and multiple areas will total the pieces for you.

What does a 9 by 12 patio at 4 inches come to if I work it out by hand?

Base area in square feet, times the compacted depth in inches, divided by 12, gives cubic feet. Divide by 27 for cubic yards and multiply by 1.50 for tons. A 9 by 12 patio open on all four sides has a base footprint of 10 by 13, or 130 square feet, which at 4 inches works out to 1.60 cubic yards and about 2.41 tons, so anything wildly off that scale means a depth got typed in the wrong unit.

Swapping #53 for a clean stone moves the tons but leaves the yards alone. Why?

Because the hole you are filling has one volume and several possible fillings. The cubic yard figure describes the space; the tonnage applies the published weight for whatever you selected, and dense graded stone at 3,000 lb a yard will always read heavier than a clean stone at 2,800.

Does the 10% box cover a first lift going into soft spring clay?

Treat it as a starting point. On firm, well-shaped subgrade it is about right, but soft spring clay swallows the first lift and the real overage runs higher. Round the order up to the next half ton rather than trusting a fixed percentage on ground that is still soft underfoot.

The apron ground drops away toward the ditch. Does that change the dimensions I enter?

No. Measure the flat plan dimensions, since the finished patio will be near level with only its drainage fall built in. The slope changes the dig, not the area: you will cut deeper at the high end and hold the base thickness constant, so the base depth you enter stays the same all the way across.

The pavers get the compliments. The base earns them.